1.国家自然科学青年基金:基于单元格的城市内施工场地动态安全布局优化模型研究(2015-2018),主持
2.北京市教委基金:强噪音影响下的脚手架杆件与工人不安全行为识别的机理研究(2021-2023),主持
3.北京市自然科学基金:基于深度学习的装配式建筑吊装安全风险预测与控制方法(2020-2023)(参与);
4.北京市自然科学基金:基于BIM的废弃混凝土资源化利用碳足迹前摄性度量研究(2020-2023)(参与);
5.企业咨询项目:抽水蓄能电站脚手架质量检测与安全预警方法研究(2019-2021),主持
6.企业咨询项目:冰上项目部BIm及智慧工地建设咨询合同(2018-2020),参与
7.企业咨询项目:哈尔滨站改造工程(2017-2020),参与
1.刘猛,黄春,王京京,王文琦,张睿.基于混合整数线性规划的塔吊选型与布置优化[J].土木工程与报,2020,37(02):142-150.
2.Huang, C. and Wong, C. K. (2019). Optimization of Vertical Elevator Movements and Material Storage Locations for High-Rise Building Construction with Overtime Cost Effects. Journal of Computing in Civil Engineering, 33(1), 04018054. https://doi.org/10.1061/(ASCE) CP.1943 -5487.0000794
3.Huang, C. and Wong, C. K. (2018). Optimization of crane setup location and servicing schedule for urgent material requests with non-homogeneous and non-fixed material supply. Automation in Construction, 89, 183-198. https://doi.org/10.1016/j. autcon. 2018.01.015
4.刘猛,黄春.基于MILP算法的预制混凝土构件生产调度优化模型研究[J].工程管理学报,2018,32(06):121-126.
5.C. Huang, and C.K. Wong, (2017), “Discretized cell modeling for optimal facility layout plans of unequal and irregular facilities”, Journal of Construction Engineering and Management (ASCE), 10.1061/(ASCE)CO.1943-7862.0001206 , 04016082.
6.Zhang W X, Huang J, Li Z, C. Huang*. “An experimental study on the lateral pressure of fresh concrete in formwork”, Construction and Building Materials, 2016, 111: 450-460.
7.C. Huang, and C.K. Wong, (2015), “Optimization of Site Layout Planning for Multiple Construction Stages with Safety Considerations and Requirements”, Automation in Construction, (53), 58–68.
8.Fung, I.W.H., Huang, C. and Tam, C.M., (2013), Application of GA Optimization for Solving Precedent Relationship Problem in Project Scheduling, Mathematical and Computer Modeling, 57 (9-10), 2067–2081.
9.C. Huang, C.K. Wong, and C. M. Tam. (2011). “Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming”, Automation in Construction, 20, 571–580.
10.C. Huang, C.K. Wong, and C. M. Tam. (2010). “Optimization of Material Hoisting Operations and Storage Locations in Multi-Storey Building Construction by Mixed-Integer Programming”, Automation in Construction, 19 (5), 656-663.